For qualified investors

BESS parks from 10 MWh as infrastructure projects.

WERAX is building its own project pipeline for battery storage parks. The focus is on large facilities from 10 MWh in selected European markets – with a first project in the range of around 50 MWh under review.

Investment logic

Storage creates value when site, grid and market align.

Physical infrastructure

BESS parks are real assets with grid connection, site, technology, operations and long-term maintenance logic.

Demand for flexibility

Volatile generation, peaks and grid expansion create demand for fast-controllable flexibility.

Operator mindset

WERAX does not just want to broker, but to develop, co-finance and operate its own projects.

Project pipeline

From site to operating asset.

A BESS park is not created by the battery alone. What matters is grid connection, land, permits, the monetisation model, technical design, safety concept, financing and operation. WERAX prioritises projects where these factors can be reliably brought together.

Switzerland is the anchor. Further target markets are Germany, France, Austria, Poland, Romania, Lithuania and the Balkans.

FOCUSBESS parks from 10 MWh
PIPELINEfirst project approx. 50 MWh under review
ROLEDevelopment · investor · operator
AUDIENCEqualified investors
ACCESSconfidential · on request
What investors should examine

Transparency before return promises.

  • 01
    Project status. Site, grid connection, permits, suppliers, timeline and technical maturity.
  • 02
    Revenue model. Market- and grid-dependent monetisation, arbitrage, flexibility services and contractual structure.
  • 03
    Risks. Market-price risk, regulatory risk, grid-connection risk, technical availability, degradation, supply chains and liquidity.
  • 04
    Documentation. Binding documents are not provided on the website, but after qualification, NDA and legal documentation.
Process

Discreet and structured.

STEP 01

Qualification

Clarifying investor profile, target size, region, risk understanding and legal prerequisites.

STEP 02

NDA & documents

Project information is shared only confidentially and on the basis of the respective legal documentation.

STEP 03

Project review

Joint review of technology, financial model, risks, timeline and participation structure.

Investor access

Request a confidential conversation.

For qualified investors, family offices and project partners.

For qualified investors · confidential and on request · files can alternatively be sent directly to info@werax-bess.com .

Important notice

No investment advice, no public offering.

The content of this page serves solely as general information about the activities of WERAX AG (in formation). It constitutes neither investment advice or a recommendation nor a public offering of financial instruments. Investments in infrastructure projects involve risks up to and including total loss. A binding offer is made exclusively on the basis of the respective legal documentation and only to qualified investors.