WERAX Batteriespeicher-Park in der Schweiz
Industrial battery storage & BESS parks

Plan storage.
Use flexibility.

WERAX AG (in formation) plans and organises battery storage from approx. 100 kWh for companies – and is building its own BESS parks from 10 MWh in selected European markets in parallel.

from 100 kWh company storagefrom 10 MWh BESS parksCH anchor Europe focus
Lastprofil — 24 hkW
Identify peaks · size storage · calculate impact
Three audiences

One storage focus. Three ways to work together.

For businesses

Storage that fits your load profile

For industry, logistics, commercial sites and campuses with PV or charging infrastructure. WERAX reviews load profile, power bill and site data and develops a realistic storage strategy from them.

View solutions
For investors

BESS parks as infrastructure

WERAX is building its own pipeline of battery storage parks. The focus is on projects from 10 MWh – with a first project in the range of around 50 MWh under review.

Open investor page
For partners

Install, supply, scale

Installation partners, sales partners, manufacturers and project developers gain clear access to WERAX projects and European target markets.

Become a partner
For businesses

When storage makes sense for your site.

01

Demand charge matters

When short peaks drive a large part of energy costs, peak shaving can be economically attractive.

02

PV present or planned

Storage shifts solar power to times of higher demand and can increase self-consumption.

03

Charging is growing

Fleets, fast-charging points and simultaneity drive power peaks – storage and load management limit them.

04

Grid connection limited

Storage can reduce upgrade costs or buy time when the grid connection cannot be expanded immediately.

Why WERAX

We see storage not just as a product but as an infrastructure project with technical, economic and regulatory logic.

Planning, project organisation and operator thinking from one hand.

How it works

From raw data to a realistic storage decision.

STEP 01

Review data

Load profile, power bill, site, PV, charging needs and grid connection are captured in a structured way.

STEP 02

Size the storage

Power in kW, capacity in kWh, operating strategy, economics and risks are modelled realistically.

STEP 03

Organise the project

WERAX coordinates technology, suppliers, installation partners, grid connection, commissioning and operation.

European focus

Switzerland as anchor, Europe as growth area.

WERAX prioritises markets by grid connection, flexibility demand, regulatory framework, site access and partner structure. Besides Switzerland, the focus is on Germany, France, Austria, Poland, Romania, Lithuania and the Balkans.

Free initial assessment

Is storage worth it for your site?

Upload your load profile, power bill or project documents – we check whether storage makes technical and economic sense.

Free & non-binding · for sites from approx. 100 kWh storage potential · files can alternatively be sent directly to info@werax-bess.com .